Chinese New Year 2027 falls on 6 February

Chinese New Year 2027 falls on Saturday 6 February 2027 and opens the Year of the Goat, and Chinese factories will stop roughly from 30 January to 27 February 2027. The official days off will most likely run from 5 to 13 February, but for an importer the production shutdown matters more, as it starts before the festival and ends several weeks after it.

If the goods are to leave China before the break, place the order by 25 December 2026 at the latest. The dates of the days off for 2027 are still indicative: the State Council of the PRC usually announces the official plan in November of the previous year. We keep all the dates, together with a file for your calendar, in one place in the Chinese holiday calendar, and we update it once the plan is announced.

Two office workers plan orders on a board with colourful sticky notes, and on the desk stands a model of a green container with a goat figurine in a yellow helmetAI image
Two office workers plan orders on a board with colourful sticky notes, and on the desk stands a model of a green container with a goat figurine in a yellow helmet

Why the break lasts a month, not a week

Chinese New Year, or the Spring Festival, is the time when factory workers return to their family homes, often at the other end of the country. Travel starts long before the festival, so production lines empty gradually, and factories stop accepting new orders as early as mid-January.

After the festival, the return is also spread over time. Some crews only come back after several weeks, and some do not come back at all because they change jobs. The factory therefore restarts with incomplete staffing and first finishes the orders from before the break. That is why we estimate the shutdown at from about a week before the festival to about three weeks after it, and the real delay to deliveries at 3-4 weeks.

For you this means two things. A production date given by the supplier in January is less certain than the same date given in September. And an order placed in February usually does not start straight away, but joins the queue behind the backlog of orders.

How to count the order deadline backwards from the shutdown

Start from the day the goods are to be in your warehouse, and count backwards. First transport: by sea it is several weeks, by rail less, by air a few days, plus customs clearance and delivery from the port. We describe the real times on each route in the article on how long transport from China to Poland takes.

Before transport comes loading and export clearance on the Chinese side, and even earlier quality control and production itself. The production time is given by the supplier, but before New Year add a buffer to it, because factories then have the most orders of the year.

The date of 25 December 2026 is the result of such a calculation for a typical order: about 6 weeks before the factories close. If your goods require longer production, new moulds or certificates, move the order earlier, ideally to November. If the goods come from the supplier's stock, you can order later, but confirm the shipment before mid-January anyway. We set out a month-by-month plan, from October to March, in the article on the order schedule before Chinese New Year.

A good test of a supplier is Golden Week at the start of October, the National Day week. It is a much shorter break, but the mechanism is the same: a backlog of orders, incomplete crews and a queue after the return. If your supplier was late with shipment after Golden Week, expect a delay several times longer at Chinese New Year and plan a bigger buffer. We describe what this October break looks like in the article on Golden Week in China.

What happens to freight before and after the festival

Before the break, everyone wants to ship goods at once. Demand for space on vessels rises, and carriers announce peak season surcharges, so rates in December and January are usually higher and free space harder to get. Book transport together with the order, not on the day the factory reports the goods are ready.

After the festival it is the other way round: factories are only just getting going, there is less cargo and rates can fall noticeably. In 2026 the lowest reading of the Drewry World Container Index for the whole year came a dozen or so days after Chinese New Year: 1,899 USD per 40-foot container (reading of 26.02.2026, Drewry World Container Index). You can follow current index readings on the freight rates from China page, and compare real freight forwarder quotes on the same route on the forwarder offers board.

A lower rate after the break will not help, however, if the goods are needed in March. Cheap shipping in the second half of February only makes sense if you arrange production so that the goods are ready right after the factories return.

Quality when production is rushed

The last weeks before New Year carry the highest risk of defects of the whole year. Factories finish orders in a hurry, some workers have already left, and final inspection is sometimes shortened to make the loading date.

Arrange a pre-shipment inspection and approve a reference sample (the so-called golden sample) before series production starts. If a defect only shows up in Poland, the complaint will go to a factory that is not working for several weeks, so the discussion about a repair or a discount will move to March.

After the break, watch out for the same thing from the other side. New people on the production line are a more frequent cause of changes in workmanship, so check the first batch after New Year as carefully as a first order from a new supplier. We describe what happens in factories after people return in the article on factories in China after Chinese New Year.

Table: Chinese New Year 2027 in dates

Below are the key dates for orders before the break, and a reference point for freight rates after the previous New Year. The shutdown dates are an estimate, and the days off are indicative until the State Council announces the plan.

Table: Chinese New Year 2027 in dates
StageDate or valueReading dateSource
Last safe orderby 25 December 2026reading 2026-09-27ImportPanel holiday calendar
Factories slow downfrom 22 January 2027reading 2026-09-27ImportPanel holiday calendar
Start of factory shutdown30 January 2027reading 2026-09-27ImportPanel holiday calendar
Days off in Chinafrom 5 to 13 February 2027, indicativereading 2026-09-27ImportPanel holiday calendar
Chinese New Year, Year of the Goat6 February 2027reading 2026-09-27ImportPanel holiday calendar
Return to full productionaround 27 February 2027reading 2026-09-27ImportPanel holiday calendar
Lowest WCI reading in 20261,899 USD per 40-foot containerreading 2026-02-26Drewry World Container Index

The first six rows are the plan for the coming break, and the last one shows what happened to rates after the previous one. You will find holiday dates for the following years, including Golden Week and shorter holidays, in the Chinese holiday calendar, which you can download as a file for Google, Outlook or Apple Calendar.

What to do if you do not make it before the break

Not every order can be placed by 25 December. In that case you have several paths, and it is worth choosing one deliberately rather than waiting for the supplier to propose something.

  • Split the order: produce and ship the urgent part before the break, and plan the rest for the first weeks after the factories return.
  • Send a small, urgent batch by air or rail, and the main cargo by sea after the break.
  • Agree with the supplier that it will buy raw materials and components before the holidays, so that production can start straight after the return.
  • Move your sales: if the goods are seasonal, check whether a delivery in March still makes sense.

If you do not want to keep track of factory deadlines, quality control and transport bookings yourself, you can outsource the whole process as part of the import from China to order service.

Checklist before Chinese New Year 2027

  • Check the shutdown dates in the Chinese holiday calendar and add them to your own calendar.
  • Place the order by 25 December 2026, and with long production as early as November.
  • Confirm in writing with the supplier the date the goods will be ready and the loading date.
  • Book transport together with the order, before space on vessels runs out.
  • Order a pre-shipment inspection and approve the golden sample before series production.
  • Plan a stock buffer for February and March in case of a delay of 3-4 weeks.
  • Agree with the supplier a production plan for the first weeks after the factories return.

Frequently asked questions

When is Chinese New Year 2027?

Chinese New Year 2027 falls on Saturday 6 February 2027 and starts the Year of the Goat. The days off in China will run roughly from 5 to 13 February, and the State Council usually announces the official plan in November of the previous year. In the following year the festival falls on 26 January 2028.

How long do Chinese factories stop for New Year?

Usually about a month, although the official holiday lasts a week. For Chinese New Year 2027 we estimate the shutdown from 30 January to 27 February. Factories slow down earlier, because workers travel home, and after the festival they return gradually, so production restarts with a delay.

By when should I order goods from China before Chinese New Year 2027?

Safely by 25 December 2026, that is about 6 weeks before the factories close. Then production, quality control and loading will be done before the shutdown. For goods with long production, new moulds or certificates, place the order earlier, ideally in November.

Do ports in China work during New Year?

Yes, ports work, although to a limited extent. The problem is not the port but the factories and offices: without production, export clearance and delivery to the port the container will not leave, even if the vessel sails on schedule. That is why the date the goods are ready counts, not the sailing schedule.

Does freight from China get cheaper after Chinese New Year?

Often yes, because there is less cargo after the break. In 2026 the lowest reading of the WCI index came at the end of February, a dozen or so days after the festival. Cheaper shipping only helps, however, if the goods are ready right after the factories return and you do not need them in the warehouse in March.

Sources

  • ImportPanel Chinese holiday calendar: days off, estimated factory shutdown and order deadline for 2026-2029, version of 27 September 2026, accessed 27 September 2026.
  • State Council of the PRC: plan of days off for 2026; plan for 2027 expected in November 2026, accessed 27 September 2026.
  • Drewry World Container Index: weekly WCI series, lowest reading of 2026 from 26 February 2026, accessed 27 September 2026.