What importing to order from China is
Importing to order from China means the goods are only made after the order is placed, to the buyer's specification, and are then transported to Poland and cleared on the buyer's behalf. It differs from buying from an importer's warehouse in that you do not choose from ready-made products, but define what is to be manufactured: material, dimensions, colour, packaging, markings and batch size. The factory starts production after the deposit, and the importer for customs purposes is you or the company that carries out the import on your behalf, depending on the contract.
In practice, this model is chosen by companies that have their own product or their own brand: online shops with a range under their logo, wholesalers with recurring goods, manufacturers bringing in components, or service companies needing a larger quantity of equipment for a specific project. The common denominator is one: the quantity and specification are specific enough that buying off the shelf makes no sense, and the margin on your own goods justifies a few months of waiting.
Distinguish this model from two others. The first is buying from a Polish importer that has the goods in stock: you get them in a few days, but you pay their margin and take what there is. The second is buying small quantities from Chinese trading platforms without an intermediary: cheap on paper, but with no quality control at source and a risk that the first shipment will also be the last. Importing to order sits in between: more work than buying from a warehouse, more security than buying blind on your own.
What importing to order from China looks like step by step
The whole process has eight stages: specification, supplier sourcing, sample, deposit and production, quality control, loading and transport, customs clearance and delivery to the warehouse. The order is fixed, but the time and cost of each stage depend on the product, so it is good to understand what happens at each of them before you pay the first money.
The specification is the document that determines everything afterwards. In it you record the material, dimensions, tolerances, colours, required markings (for example the CE mark, the separate collection symbol on a battery, the details of the responsible operator in the EU), the packing method and the number of units. The more precisely you describe the product, the fewer surprises at the sample stage and the easier it is to settle a complaint, because the factory is responsible for conformity with what it signed.
Sourcing is choosing a factory, not an intermediary. You check whether the company really manufactures rather than just trades, what certificates it has, what history of exports to Europe and what minimum production run. Then a sample is ordered, often paid for, and compared with the specification. Only after the sample is approved is the deposit paid and production started. The rest is paid before shipment, after quality control, which covers a random batch from finished production: dimensions, functions, packaging, markings. The inspection before paying the balance is the last moment when you have real influence over the factory.
We described the transport and clearance stage in detail in the guide importing from China step by step, so here only the framework: loading a container or a groupage shipment, sea, rail or air freight, a customs declaration with the correct CN code, payment of customs duty and VAT or accounting for VAT in the return, delivery to the warehouse. If you entrust the whole thing to one company, you get one partner for all eight stages. You will find the scope of such a service and a delivery date calculator on the import from China to order page.
How long importing to order from China takes
The realistic time from enquiry to goods in the warehouse is 3-5 months if the goods go by sea. A shorter route exists, but it is more expensive: by rail the whole thing closes a few weeks faster, and by air the transport stage takes about a week, except that the cost per kilogram rules out most bulk goods.
Those months are made up of several stages of different lengths. The quote and choice of supplier take from a few days to two weeks, depending on whether you have a ready specification. Production is usually from a week to a month, and longer for products with a custom mould or printing. We count the sea stage itself at about 90 days, because apart from the voyage it includes waiting for the vessel, transhipments and queues in ports; the times in carriers' tables, which give 35-45 days port to port, describe only part of this journey. On top of that come clearance, from one day to a week, and delivery to the warehouse.
The most common planning mistake is counting from the date the deposit is paid, not from the first email. Companies that want goods for the Christmas season must start talks by late spring or early summer at the latest. A separate, non-obvious factor is Chinese New Year: factories stop for two to four weeks, and before the break ports and carriers work at the limit of their capacity. We give detailed ranges for each type of transport in the article how long transport from China to Poland takes.
How much importing to order from China costs
The price consists of five elements: the ex-factory value of the goods, freight with port charges, customs duty, VAT, and the fee of the company carrying out the import. The first three depend on the market and the product. Import VAT can be deducted by an active VAT payer to the extent the goods are used for taxable activities and once the statutory conditions are met. The conditions for deduction are explained by the Ministry of Finance. The service fee is agreed in advance.
Freight is the most variable item, which is why we keep its history in our own database. The table below shows historical readings with their dates, not a current transport offer. You will find the latest comparative data in the freight rates overview.
| Indicator | Value | Reading date | Source |
|---|---|---|---|
| Drewry WCI, 40-foot container, global index | 4,465 USD | reading 2026-09-03 | Drewry World Container Index |
| Drewry WCI, 12-month minimum | 1,615 USD | reading 2025-10-09 | Drewry World Container Index |
| Drewry WCI, 12-month maximum | 4,639 USD | reading 2026-07-09 | Drewry World Container Index |
| Drewry WCI, 2025 annual average | 2,452.02 USD | year 2025 | Drewry World Container Index |
| SCFI, Shanghai composite index | 3,590.05 pts | reading 2026-09-04 | Shanghai Shipping Exchange |
| ERAI, China-Europe rail freight, per FEU | 4,084 USD | reading 2026-08-17 | Eurasian Rail Alliance Index |
| Drewry, East-West air freight, per kg | 3.91 USD | reading 2026-08-31 | Drewry East-West Air Freight Price Index |
| USD/PLN rate, NBP mid | 3.7145 PLN | reading 2026-09-04 | NBP, table A |
What this means for the budget: the rate for a 40-foot container is now close to the upper limit of the last twelve months and clearly above the 2025 average. At such levels freight can make up a quarter of the import cost for cheap, bulky goods, while for expensive, compact goods it falls to a few per cent. That is why, when quoting, we calculate the cost per unit, not a percentage mark-up: we allocate freight by volume, customs duty by the item in the customs document, insurance by value.
The fee for handling an import to order depends on how much work lies with the company carrying it out. A new project with sourcing and factory verification starts with us from 5,000 PLN net; repeating the same goods with a proven supplier costs less, because searching for and checking the factory falls away, and we charge less for smaller batches consolidated with other clients. A full cost breakdown for an example container, together with a delivery date calculator, is on the service page. The way freight itself is calculated and the items freight forwarders add to the base rate are described in the article the cost of freight from China.
When importing to order pays off, and when it does not
Importing to order pays off when the value of the batch is large enough that the cost of handling, freight and clearance is a reasonable percentage of the price of the goods, and the product is repeatable. It does not pay off for a one-off carton, for goods that cannot be sold within a few months, or when you need them in three weeks.
The simplest test is comparing the cost of handling with the value of the goods. One carton with verification at source costs more to handle than the goods themselves worth a few hundred dollars, and in such situations we advise clients against the whole idea. With a few pallets the numbers start to work, provided the goods are combined in consolidation with other orders. With a full container, freight per unit falls to a level at which most products with a reasonable margin hold up easily, especially since customs duties on many product groups from China are a few per cent, and the ability to deduct VAT depends on the taxpayer's status and the use of the goods for taxable activities.
The second issue is MOQ, the minimum order quantity imposed by the factory. In production to specification, the factory sets up the line for you and will not go below a certain number of units, and trying to negotiate MOQ down usually ends with a higher unit price. If the MOQ exceeds what you will sell in a season, buying a finished product is better, possibly with minor personalisation such as a label or packaging that the factory does without retooling the line.
The third issue is time. When the deadline is near and the batch is small, air or rail transport makes sense despite the higher rate, because the cost of capital frozen for three months and of lost sales is often higher than the surcharge for faster transport. With sea groupage, or LCL, you add consolidation and deconsolidation, which lengthen the journey and raise the cost per cubic metre, so the break-even point for a full container is lower than many importers assume.
Importing to order, on commission or made to order
These are three names for the same model, and it is worth knowing, because service companies use them interchangeably and clients search in different ways. Importing on commission stresses that the company acts on your behalf, importing made to order emphasises that the goods are only made after the order, and importing to order from China is the term most often used in the industry. In all three cases the point is the same: a product to your specification, production after a deposit, transport and clearance on your behalf.
The difference that matters lies elsewhere: who is formally the importer and in whose company's name the clearance goes. In the first arrangement you are the importer, so your company pays the customs duty and VAT, appears in the customs declaration and is responsible for the product's compliance with the rules, while the service company acts as an agent and organiser. In the second arrangement, the company carrying out the import appears as the importer, takes on the documentation and the product's compliance with EU law, and you collect the goods in Poland. That is how we work when a client needs it: we pass on costs from freight to official charges one for one according to the source invoices, and our fee is a single fixed charge agreed in advance. Before you sign a contract with anyone, establish directly which of these arrangements you are getting and whether costs are passed on without a hidden margin.
Checklist before your first import to order
- A product specification written in one document: material, dimensions, tolerances, markings, packaging, number of units.
- A checked CN code and customs duty rate for the product, including any anti-dumping duty.
- Legal requirements for the product group: CE mark, responsible operator in the EU, battery and packaging markings.
- A factory verified as a manufacturer, with a history of exports to Europe and an approved sample.
- A payment schedule linked to quality control: the balance only after inspection.
- A budget calculated per unit: goods, freight by volume, customs duty, insurance, handling.
- A delivery date counted from the first email, taking Chinese New Year into account.
- Agreement on who is the importer and in whose company's name clearance goes.
Frequently asked questions
How does importing to order differ from buying from an importer's warehouse
With importing to order, the goods are made after your order, to your specification, and your company is the importer. When buying from a warehouse, you take a finished product, pay the intermediary's margin and have no customs obligations, but also no influence over what the product looks like.
How long does importing to order from China take
Realistically 3-5 months with sea transport, counting from the first enquiry to the goods in the warehouse. The sea stage itself takes about 90 days, production from a week to a month, clearance up to a week. Rail shortens the whole thing by a few weeks, air shortens transport to about a week, but costs per kilogram.
Does importing to order pay off for a small batch
For a single carton, no, because handling and verification at source cost more than the goods. For a few pallets, yes, if the batch is consolidated with other orders. With a full container, freight per unit falls to a level at which most goods with a reasonable margin hold up.
Who pays customs duty and VAT when importing to order
Whoever appears in the customs declaration as the importer. If it is your company, customs duty is a cost, and deducting import VAT depends on your status as an active VAT payer, the use of the goods for taxable activities and meeting the statutory conditions. Accounting for VAT in the return instead of paying at clearance requires a separate check of the conditions. If the importer is the company carrying out the import, as in our model, it clears the goods and passes customs duty and official costs on to you according to the source invoices.
Will the factory make a product under my brand
Yes, that is the most common reason for choosing to import to order. You have to reckon, however, with an MOQ for a version with your own logo, packaging or colour that is higher than for a standard product, and with the fact that as the importer you are responsible for the product's compliance with EU rules.
Sources
- Drewry World Container Index, weekly readings from our database, latest from 2026-09-03.
- Shanghai Containerized Freight Index, Shanghai Shipping Exchange, reading from 2026-09-04.
- Eurasian Rail Alliance Index, reading from 2026-08-17.
- Drewry East-West Air Freight Price Index, reading from 2026-08-31.
- National Bank of Poland, table A of mid rates, 2026-09-04.
- ImportPanel, service page for importing to order from China: scope of service, stage durations and an example cost breakdown.
