What is missing from a typical folder from a Chinese supplier

The set most buyers receive includes a declaration of conformity with the Machinery Directive, a declaration or report under the Electromagnetic Compatibility Directive, a certificate issued by a laboratory, a user manual and photos of the rating plate. It lacks two documents without which the machine may not legally be placed on the market in the EU: noise documentation involving a notified body, and an EU type-approval certificate for the engine at Stage V. Both are described below, because both can be checked before you pay a deposit and both decide the outcome of any inspection.

Before we go into detail, one point that clarifies responsibility. When you buy directly from a manufacturer outside the EU, you become the importer, and that is not a passive role. The Chinese manufacturer is beyond the reach of Polish authorities, so the summons, the decision and the penalty will land with you. What is more, the Market Surveillance Regulation (EU) 2019/1020 requires in Article 4 that there is an economic operator in the EU responsible for the machine, and that its name and address are given on the product, the packaging or an accompanying document. Article 4 expressly covers both the Machinery Directive and the Noise Directive. With a direct purchase, that operator is you, and your details must appear on the machine or in the documents. The same applies to importing to order to your own specification, if customs clearance is in your company's name.

It is worth dispelling straight away the hope that a used machine is easier. It is not. An excavator brought in from China, even a used one, is being placed on the EU market for the first time, so it must meet all current requirements. That is a completely different situation from buying a used machine from a company in Germany, where what counts is the legal position on the date it was first placed on the market.

"Euro V engine" is not type-approval for construction machinery

If you see "Euro V" in an offer, treat it as a warning sign, not as a selling point. Euro V is a standard for road vehicles and has no application to a non-road machine. Engines in working machinery are subject to Regulation (EU) 2016/1628, and the level that matters is called Stage V.

The phrase "Euro V certificate" in mini excavator offers is so widespread that you can find it verbatim in Chinese manufacturers' descriptions. Behind it there is usually one of three things: a terminology mistake, a road type-approval for the engine carried over from a completely different market, or the Chinese national standard China IV or China V, which is not recognised in the EU. None of them makes the machine legal.

A common counter-argument goes: my excavator has a small engine, so it probably is not covered. It is. Stage V extended the scope of regulated engines downwards to compression-ignition engines below 19 kW, and also brought in the band below 8 kW. In practice this means every diesel in a mini excavator, from the smallest units of a few kilowatts, needs EU type-approval. Engines from 56 to 130 kW became subject to the obligation a year later than the others, but today all power bands are covered.

There is one more detail that decides when the problem becomes your problem. For a machine brought in from outside the EU, the engine is deemed placed on the market at the moment of customs clearance. Not when the machine is sold to a customer, not after it is registered, but when you release the goods for free circulation. After that point there is little room to manoeuvre: re-export or replacing the engine with a type-approved one, and the latter makes you the manufacturer of a modified machine with all the responsibility that entails.

What exactly to request from the supplier: the EU type-approval number of the engine and a photo of the engine plate on which that number is stamped. The number can be checked with the manufacturer of the power unit. In mini excavators, genuine Stage V type-approval is most often held by engines of brands you would choose anyway for parts availability. If the specification lists an unnamed "Kubota-type" engine, there is usually no type-approval.

A variant that avoids this problem entirely is a battery-powered machine. Then, however, the Battery Regulation and a separate set of obligations come in, which we wrote about in the article on the battery label and its conditional deadline.

Noise: the document almost no offer has

This is the second gap and also the best test of a supplier's credibility, because almost nobody closes it. Hydraulic excavators with a power below 500 kW are listed in Article 12 of Directive 2000/14/EC, meaning they belong to equipment subject not merely to a marking obligation but to a hard noise emission limit. There are three consequences, and all can be checked from a photo of the machine.

First, conformity assessment for equipment under Article 12 follows Annex VI, VII or VIII of the directive, and in each of these variants a notified body is involved. Equipment under Article 13, which is subject to marking only, uses Annex V and does without a notified body. An excavator is on the harder side.

Second, the machine must carry a permanent and visible marking of the guaranteed sound power level, meaning a separate sticker or plate with a figure in decibels. Neither the CE mark nor the rating plate replaces it.

Third, that figure cannot be arbitrary. For excavators, the limit depends on the net engine power: for machines up to 15 kW, the guaranteed sound power level may not exceed 93 dB, and above 15 kW it is calculated from the formula 80 plus 11 times the base-ten logarithm of the power in kilowatts. For an example twenty-kilowatt machine this comes to about 94 dB. These values apply in the second stage of the directive, that is from 3 January 2006.

The practical application is simple. Ask for a photo of the decibel sticker and for a noise test report with the notified body's number, and then check that number in the EU database of notified bodies. If the supplier does not understand the question or sends back the same certificate as before, you already know what its compliance process looks like.

A certificate from a laboratory is not a declaration of conformity

This distinction is worth understanding once, because it comes back with every machinery import. An excavator is not on the list in Annex IV of the Machinery Directive, among the particularly dangerous machines for which a notified body must step in. This means that, as far as the Machinery Directive alone is concerned, the manufacturer carries out conformity assessment with internal checks and signs the declaration itself. Documents called "Attestation of Conformity" or "Certificate of Conformity", issued by testing laboratories, are voluntary in this arrangement. They can be useful as material for the technical documentation, but they replace nothing and do not in themselves prove conformity. They are also sometimes simply fake, so it is always worth verifying them in the issuer's database.

The document that really counts is the manufacturer's EC declaration of conformity. Check four things in it. Whether it lists all the relevant acts, including Directive 2000/14/EC, not just the Machinery and EMC directives. Whether it gives the name and address of the person authorised to keep the technical documentation, who must be established in the EU. Whether it identifies the machine precisely enough to link it to the serial number on the plate. Whether it states the notified body for the Noise Directive.

Then there is the manual. It must be complete and translated into Polish, and cover assembly, commissioning, maintenance and residual risks. A manual only in English is an infringement, and in the event of an accident at work it is the first thing an inspector will ask for.

Separately, although outside the Machinery Directive itself, it is worth asking for the test report for the operator protective structure. For compact machines this means the roll-over protective structure; for larger ones, protection against falling objects is added. This is a document that a reliable manufacturer simply has.

Our calendar: obligations that will be added to this machine

Importing a machine is not only about the conformity of the machine itself. Below are the dates from our regulatory calendar that genuinely affect this delivery. They are not machinery rules but horizontal importer obligations that are easy to forget until a summons arrives.

Our calendar: obligations that will be added to this machine
ObligationEffective dateWhat it means for an excavatorStatus
Separate collection symbol on the battery18.08.2025applies to the starter battery built into the machineapplies
Packaging Regulation PPWR12.08.2026crate, wooden blocks and transport filmapplies
QR code on the battery18.02.2027the requirement also covers the battery in the machinedeadline fixed
Ban on products made with forced labour14.12.2027supply chain checks at the machine manufacturerdeadline fixed

Two remarks that save unnecessary panic. The CBAM mechanism, in force in its definitive period from 1 January 2026, covers steel, aluminium, cement and fertilisers, not finished machines from Chapter 84, so it does not apply to an excavator. The Deforestation Regulation does not come into play here either, because packaging material used solely to protect and carry another product is excluded from its scope. What remains, however, is the requirement to mark wood packaging material under the ISPM 15 standard, which is separate from both of these matters and must always be remembered.

With the starter battery, one distinction is worth adding that no guide makes. The requirement for batteries to be replaceable by the user applies to portable batteries, not the starter battery, whereas the QR code covers every battery. In addition, when you place a machine with a battery on the market, you also place that battery on the market, which means registration and reporting obligations in BDO.

Customs duty, VAT and the cost of bringing the machine in

A mini excavator with a superstructure rotating through 360 degrees is classified under CN heading 8429 52, and tracked machines under subheading 8429 52 10. We show how to confirm the CN code of your goods in the tariff yourself in the guide CN code: how to check it. The erga omnes customs duty rate is 0 per cent, so for this machine you pay VAT, not customs duty. You can account for import VAT at 23 per cent in your return instead of paying it at clearance, using the simplification in Article 33a of the VAT Act. It is worth agreeing this with the customs agency in advance, not on the day the documents arrive. We set out the mechanics of building the taxable amount in the article on customs duty and VAT when importing from China.

A zero duty rate does not exempt you from checking whether trade defence measures apply to the specific code. That check is done once, in TARIC, and takes a minute. A starting point can be the current list of products with anti-dumping duty.

The biggest variable remains transport, because a machine of this size usually travels in a container. Below are our sea freight index readings, to anchor the calculation in figures rather than in a freight forwarder's assurances.

Customs duty, VAT and the cost of bringing the machine in
IndicatorValueReading dateSource
Drewry WCI, 40-foot container4,297 USD per container06.08.2026Drewry World Container Index
Minimum of the last 12 months1,615 USD09.10.2025Drewry World Container Index
Maximum of the last 12 months4,639 USD09.07.2026Drewry World Container Index
NBP mid rate3.7324 PLN per 1 USD07.08.2026NBP, table A

The spread between the minimum and maximum over the last year is bigger than many people assume, and sea freight alone is now 77.27 per cent more expensive than a year ago. With a machine where you negotiate single percentage points of the price with the supplier, the moment you book transport can weigh more than the negotiation itself. We publish current quotations on the freight rates from China page, and we described the method for building the full delivery cost in the article on the cost of freight from China.

What is checked during an inspection

There is not one inspection but four, and each looks at something different.

At the border, the customs authority verifies that the goods match the declaration, the tariff code, the customs value and the visible CE marking. An understated value on the invoice is the most common reason for a shipment of machinery from China to be held, and the market surveillance rules allow the customs authority to suspend release of the goods and call in the market surveillance authority.

Market surveillance, meaning the Office of Competition and Consumer Protection together with the trade inspection, looks at the completeness and content of the declaration of conformity, the availability of technical documentation, the CE marking and the plate, the sound power marking, the Polish-language manual and the details of the responsible operator. Possible outcomes are a ban on making the product available, an order to withdraw it from the market and a financial penalty.

The National Labour Inspectorate inspects the machine at the user, that is after purchase and usually after some incident. It checks the marking, the technical and operating documentation in Polish, the technical condition and guards, the workstation risk assessment, training and the earthmoving machinery operator's qualifications. It can halt operation of the machine.

The fourth inspection is not called an inspection, but it hurts the most. After a loss, the insurer will ask for the conformity documents, and after an accident at work the prosecutor will ask for them. A missing set is then not just a formal problem.

Separately, it is worth confirming with the Office of Technical Inspection whether a specific machine with load-lifting attachments is subject to technical supervision. That question takes one phone call, and the answer changes the commissioning schedule of the machine.

If the machine is due to arrive in 2027

Delivery times from China are counted in months, so this paragraph concerns some of the people reading this article today. From 20 January 2027 the Machinery Directive is replaced by Regulation (EU) 2023/1230. There is no period in which both acts apply in parallel, and there is no grace period for new placings on the market. Machines placed on the market in accordance with the directive before that date may continue to be made available, but a machine placed on the market after it must comply with the regulation.

The practical conclusion is one: if you are signing a contract for a machine that is to be cleared close to that boundary or after it, write Regulation 2023/1230 into the contract now and transfer the risk of non-conformity to the supplier. A manufacturer that cannot show noise documentation today will not prepare it in time for the new regulation.

Checklist before paying the deposit

  • Ask for a scan of the EC declaration of conformity and check that it lists Directive 2000/14/EC and a person established in the EU authorised to keep the technical documentation.
  • Ask for the EU type-approval number of the engine at Stage V and a photo of the engine plate with that number.
  • Ask for a photo of the sticker with the guaranteed sound power level and the noise report with the notified body's number.
  • Check the notified body's number in the EU database, and laboratory certificates in their issuer's database.
  • Ask for the manual in an editable file so that it can be translated into Polish before delivery.
  • Establish the brands of the engine, hydraulic pump and cylinders, because parts availability after two years depends on them.
  • Ask whether the cab has factory-filled air conditioning, because importing equipment containing refrigerant is subject to separate requirements.
  • Write into the contract conformity with the Machinery Directive, EMC, the Noise Directive and Stage V, a contractual penalty and the right of return at the supplier's expense.
  • Set payment as a 30 per cent deposit and 70 per cent after pre-shipment inspection, and include photos of all plates in the scope of the inspection.
  • Check in TARIC whether there are trade defence measures for your code.

If, after this list, you conclude that the supplier will not close the compliance gaps, consider buying from a European importer or distributor. Then responsibility for conformity, warranty and service rests with them, and the price difference is often smaller than the cost of one failed container. We described the whole process of ordering from China, from choosing a supplier to customs clearance, in the guide importing from China step by step.

Frequently asked questions

Is a Chinese mini excavator with a CE mark legal in Poland?

The CE mark on its own decides nothing, because the manufacturer affixes it and nobody checks it when it does so. Legality depends on whether the mark is backed by the full set: a declaration of conformity listing all the relevant acts, technical documentation available in the EU, Stage V engine type-approval, noise documentation with a notified body, sound power marking and a manual in Polish. A machine with a CE mark and without these documents is a non-compliant machine.

What does "Euro V engine" mean in a mini excavator offer?

Most often nothing that could be used in the EU. Euro V concerns road vehicles, while working machinery is subject to Regulation 2016/1628 and Stage V. Ask for the EU type-approval number of the engine. If the supplier sends another commercial certificate instead of a number, assume there is no type-approval.

Does an engine below 19 kW also require Stage V type-approval?

Yes. Stage V covered compression-ignition engines below 19 kW, including the band below 8 kW. There is no threshold below which a mini excavator would be exempt from the requirement, so the small engine argument does not work.

What documents must I have for an inspection at my company?

The EC declaration of conformity, the manual in Polish, the customs clearance documents and proof that the details of the responsible operator are placed on the machine or in the documents. In addition, on the user's side, the workstation risk assessment and the operator's qualifications. Keep the declaration and documentation for ten years, and customs documents for five.

How much customs duty is there on a mini excavator from China?

For CN heading 8429 52 the erga omnes customs duty rate is 0 per cent, and tracked machines are classified under subheading 8429 52 10. So you pay VAT at 23 per cent, calculated on the customs value increased by transport costs to the EU border. It is worth confirming the rate in TARIC for the specific code before clearance.

Does a used excavator from China have milder requirements?

No. A machine brought in from outside the EU is being placed on the EU market for the first time, so it is subject to current requirements to the same extent as a new one. This also applies to engine type-approval, because on import the engine is deemed placed on the market at the moment of customs clearance.

Sources

  • Directive 2006/42/EC on machinery: eur-lex.europa.eu
  • Regulation (EU) 2016/1628, emission requirements for engines for non-road mobile machinery: eur-lex.europa.eu
  • Directive 2000/14/EC on noise emission by equipment for use outdoors: eur-lex.europa.eu
  • Regulation (EU) 2023/1230 on machinery, applicable from 20 January 2027: eur-lex.europa.eu
  • European Commission database of notified bodies: webgate.ec.europa.eu
  • Product market surveillance in Poland, Office of Competition and Consumer Protection: uokik.gov.pl